Temperance Hospital – HS2 project, London, UK

Acting on behalf of Lambert Smith Hampton, RSK undertook an extensive demolition asbestos survey of the Insull Memorial Wing of the National Temperance Hospital, London, before its demolition as part of the High Speed 2 (HS2) railway project. The two-week project intrusively investigated all areas of the structure for asbestos-containing materials.

Several areas of the site were too structurally unsound to enter, so RSK aided Lambert Smith Hampton in developing asbestos management recommendations for dealing with demolition in these areas based on a desktop study of the existing asbestos information on the site.

Read more by downloading the pdf below

Temperance Hospital – HS2 project, London, UK

Related items